Eskom Crisis Worsens: 60-Hour Power Cuts Monthly From July 3 as New Coal Shutdown Plan Sparks Outrage!

60-Hour Power Cuts – South Africa is once again plunged into uncertainty as Eskom’s controversial new coal shutdown plan comes into effect, triggering nationwide fury and fears of prolonged blackouts. Beginning July 3, millions of South Africans are bracing for up to 60 hours of power cuts every month, adding to the already strained electricity grid. The new load shedding surge is directly tied to Eskom’s decision to accelerate the decommissioning of several coal-fired power stations, a move the government claims is part of its “green energy transition.” While the goal is to reduce carbon emissions and promote renewable energy, the reality on the ground is grim. Households are preparing for extended darkness, businesses fear revenue losses, and hospitals are scrambling to secure backup power. Communities most affected by poverty and limited infrastructure are the hardest hit, raising widespread concerns over economic inequality and access to basic services. The shutdown of key coal plants—many of which still supply a large portion of South Africa’s base-load electricity—comes at a time when renewable energy is not yet ready to fill the gap. The Department of Energy and Eskom say this is a “necessary short-term sacrifice” for a long-term sustainable future, but critics argue it’s rushed, poorly planned, and politically driven. This article breaks down the full impact of the Eskom crisis, who is affected, which coal plants are closing, how you can prepare, and what the government is doing (or not doing) to protect ordinary citizens. Read on for full breakdowns, load shedding schedules, official responses, and what to expect going forward.

60-Hour Power Cuts Monthly – What It Means for You

The new energy crisis will hit urban, peri-urban, and rural areas differently—but no one is spared.

  • Eskom has officially confirmed the move to 60+ hours of monthly load shedding.
  • The change takes effect starting July 3, 2025.
  • Coal station closures will result in a 4,000MW power generation loss.
  • Urban areas may see longer evening blackouts.
  • Rural communities could face two or more blackout periods daily.
  • Emergency services are already preparing for grid instability.
  • The economy could lose an estimated R6 billion per month in productivity.

Breakdown of Regions and 60-Hour Power Cuts Impact

Different provinces will be affected in different ways based on infrastructure and energy demand.

Province Daily Avg Blackout Peak Hours Affected Backup Support Priority Areas? Eskom Coverage Municipal Load Added Expected Duration
Gauteng 4 hrs 6PM – 10PM Limited Yes High Yes 60 hrs/month
Western Cape 3.5 hrs 7AM – 9AM & 6PM Medium Partial High Yes 52 hrs/month
KwaZulu-Natal 5 hrs 10AM – 2PM & 8PM Low No Medium Yes 65 hrs/month
Eastern Cape 6 hrs Morning & Evening Low No High Yes 72 hrs/month
Northern Cape 2 hrs Noon – 2PM High Yes Medium No 40 hrs/month
Limpopo 5.5 hrs Randomized Very Low No High Yes 68 hrs/month
North West 4 hrs 7PM – 10PM Low Partial High Yes 58 hrs/month

Eskom’s Coal Shutdown Timeline Sparks National Uproar

As part of South Africa’s commitment to reduce its carbon footprint, Eskom is closing several key coal plants.

  • The shutdown began with Komati Power Station in 2023.
  • By July 2025, three additional plants—Hendrina, Camden, and Grootvlei—will be fully decommissioned.
  • Each plant contributes roughly 800MW–1,200MW to the grid.
  • Communities near the plants fear job losses and economic collapse.
  • Eskom promises retraining and job reallocation programs.

Key Coal Plants Being Closed

Here’s a table of the major coal power stations being decommissioned:

Power Station Province Capacity (MW) Shutdown Status Employees Affected Replacement Energy?
Komati Mpumalanga 1,000 Fully closed 800+ None yet
Hendrina Mpumalanga 1,200 By July 2025 950 Wind proposed
Camden Mpumalanga 1,100 By August 2025 700 Solar in planning
Grootvlei Free State 950 September 2025 620 None confirmed

Government Response: Denial, Delays, and Disaster Management

Officials say this is all part of a “managed transition,” but criticism is growing louder every day.

  • Minister of Energy insists there will be “minimal disruption” despite data proving otherwise.
  • Treasury has not allocated new emergency energy funds.
  • The Department of Public Enterprises says backup diesel generation is “not sustainable.”
  • Municipalities are left scrambling to communicate new load shedding schedules.

Parliament’s Stance and Political Fallout

This policy shift is turning into a political minefield.

Political Party Public Stance Action Taken Popular Reaction
ANC Supports transition Defends Eskom policy Mixed
DA Calls for delay in shutdown Filed urgent motion Supportive
EFF Demands nationalization of energy Proposed new bill Strong public backing
IFP Wants coal plants refurbished Letter to Parliament Positive in rural KZN

What South Africans Can Do to Prepare

With at least 60 hours of monthly outages expected, here’s how citizens can cope.

  • Buy UPS or battery backup systems for essential appliances.
  • Install solar panels if financially possible.
  • Charge devices and power banks before scheduled outages.
  • Keep non-perishable food and water stocked.
  • Plan meals and work hours around the load shedding schedule.
  • Use energy-efficient bulbs and unplug devices when not in use.
  • Join community WhatsApp groups for schedule updates.

Top 7 Backup Devices in Demand

Device Type Avg Price (ZAR) Power Capacity Duration Availability
Lithium Inverter R12,000 1500W 5–8 hrs High
Power Bank (20,000mAh) R400 Small Devices 2–3 hrs Very High
Mini Gas Stove R600 N/A N/A Medium
Solar Lantern R250 Low 3 hrs High
Diesel Generator R18,000 5kVA 8 hrs Limited
Rechargeable Bulbs R70 N/A 2 hrs High
Smart Home UPS R4,500 600W 3 hrs Moderate

Economic & Social Impact of Load Shedding Spike

The ripple effects of this crisis extend far beyond just inconvenience.

Small Business Suffering Across Sectors

  • Retailers report a 15–20% drop in sales due to unscheduled outages.
  • Restaurants are spending extra on gas or generators.
  • Internet-dependent businesses face heavy disruptions.
  • Remote workers complain about missing deadlines and pay cuts.
  • Taxi drivers and ride-share services are impacted by long fuel lines at stations.

School & Hospital Impact Raises Concern

Education System Under Strain

  • Online learning is nearly impossible during long power cuts.
  • Teachers in rural areas struggle to complete syllabus.
  • Private schools are increasing tuition to cover backup power costs.

Hospitals and Clinics Under Pressure

  • Medical equipment malfunctions during outages.
  • Vaccination fridges require daily generator use.
  • Ambulance services are reporting longer response times.
  • Rural clinics sometimes close early due to darkness and no power.

Coal Plant Closures & Power Crisis Timeline

Date Key Event Impact
July 3, 2025 New load shedding plan starts 60 hrs/month blackouts
July 15, 2025 Hendrina shutdown completed 1,200MW loss to grid
Aug 12, 2025 Camden officially ceases operations 1,100MW loss
Sep 20, 2025 Grootvlei shutdown begins 950MW removed from system
Oct 2025 Wind projects delayed in Parliament No relief expected
Nov 2025 Eskom emergency fund requested from Treasury Pending approval
Jan 2026 Expected first solar backup plant commissioning May bring 300MW (still a shortfall)

While Eskom frames this coal plant closure initiative as a necessary sacrifice for a greener future, it has triggered a nationwide crisis that many believe could have been avoided with better planning. Until long-term infrastructure is in place, millions of South Africans will have to endure longer, more unpredictable power outages—further dimming hopes for energy stability in the near future.

FAQs About the Eskom Coal Shutdown & Load Shedding Plan

Q1: Why is Eskom shutting down coal plants now?
A: The government is pushing for a renewable energy transition to meet climate goals under international agreements.

Q2: Are renewables ready to replace coal yet?
A: Not entirely. The current infrastructure cannot supply enough consistent energy to fill the coal gap.

Q3: Will load shedding reduce after the shutdown?
A: Not immediately. In fact, blackouts are expected to worsen before stabilizing in 2026 or beyond.

Q4: Which regions will be most affected?
A: Mpumalanga, Eastern Cape, and Limpopo will likely see the worst of the outages.

Q5: What support is being offered to affected workers?
A: Eskom claims there will be reskilling and job placement programs, but details remain unclear.

Leave a Comment